Overview
Quick Details
- Warranty:
-
5YEARS, 25 Years Life Time
- Free installation service:
-
NO
- Place of Origin:
-
Guangdong, China
- Brand Name:
-
Vmaxpower
- Model Number:
-
MU-SGS5KW
- Application:
-
Home, Commercial, Industrial
- Solar Panel Type:
-
Monocrystalline Silicon, Polycrystalline Silicon
- Controller Type:
-
MPPT, PWM
- Mounting Type:
-
Ground Mounting, Roof Mounting, Carport Mounting,BIPV Mounting
- Load Power (W):
-
5000W
- Output Voltage (V):
-
110V/120V/220V/230V
- Output Frequency:
-
50/60Hz
- Work Time (h):
-
24Hours
- Certificate:
-
CE/ISO9001
- Pre-sales project design:
-
Yes
- Product name:
-
On-grid Solar Power System
- Combiner box:
-
Anti-lighting Function
- Mounting type:
-
6m C type steel
- Solar panel:
-
Monocrystalline Silico
- AC output:
-
110V/120V/220V/230V
- Technical Support:
-
Complete Technical Support
- Capacity:
-
5000W
Solar energy is inexhaustible Grid-connected power generation system. The system is directly integrated into the national grid without batteries, Free choice of solar panels (monocrystalline/polycrystalline) Promote spontaneous self-use and build your own sun room Model No. | System Capacity | Solar Module | Inverter | Installation Area | Annual energy output(KWH) |
Power | Quantity | Capacity | Quantity |
MU-SGS5KW | 5000W | 285W | 17 | 5KW | 1 | 34m2 | ≈8000 |
MU-SGS8KW | 8000W | 285W | 28 | 8KW | 1 | 56m2 | ≈12800 |
MU-SGS10KW | 10000W | 285W | 35 | 10KW | 1 | 70m2 | ≈16000 |
MU-SGS15KW | 15000W | 350W | 43 | 15KW | 1 | 86m2 | ≈24000 |
MU-SGS20KW | 20000W | 350W | 57 | 20KW | 1 | 114m2 | ≈32000 |
MU-SGS30KW | 30000W | 350W | 86 | 30KW | 1 | 172m2 | ≈48000 |
MU-SGS50KW | 50000W | 350W | 142 | 50KW | 1 | 284m2 | ≈80000 |
MU-SGS100KW | 100000W | 350W | 286 | 50KW | 2 | 572m2 | ≈160000 |
MU-SGS200KW | 200000W | 350W | 571 | 50KW | 4 | 1142m2 | ≈320000 |
Module No. | MU-SPS5KW | MU-SPS8KW | MU-SPS10KW | MU-SPS15KW | MU-SPS20KW | MU-SPS30KW | MU-SPS50KW | MU-SPS100KW | MU-SPS200KW |
Distribution Box | Essential internal components of the distribution box AC switch, photovoltaic reclosing; Lightning surge protection, grounding copper bar |
Bracket | 9*6m C type steel | 18*6m C type steel | 24*6m C type steel | 31*6m C type steel | 36*6m C type steel | Need to design | Need to design | Need to design | Need to design |
Photovotaic cable | 20m | 30m | 35m | 70m | 80m | 120m | 200m | 450m | 800m |
Accessories | MC4 connector C type steel connecting bolt and screw | MC4 connector Connecting bolt and screw Medium pressure block edge pressure block |
Remarks: In the grid-connected system, the distribution box can be installed with lightning-proof conbiner box directly, and the space is regular. (Lightning grounding will be calculated separately and specific design is required) 1.Photovoltaic group series: Photovoltaic modules are connected in series, series and parallel, and then connected to grid connected tp grid connected inverter 2.DC anti-reverse protection box: Disconnect the circuit overload and short circuit current generated to protect the photovoltaic module. 3.Grid-connected inverter: Key equipment for converting DC to AC 4.AC distribution box: connect the output cable of the grid-connected inverter to the connection point after over-voltage protection.Core power board, 25-year product quality and power compensation liability insurance. The inverter provides five-year product quality and failure insurance. The bracket is guaranteed for ten years. No light pollution, zero emission, no radiation Wire troughs for reasonable wiring. Low cost, high yield When installing power stations, it is best to erect lightning rods nearby to avoid unnecessary losses.What is your roof area? What size system do you plan to build? According to the provided roof area, the largest array of photovoltaic systems can be arranged Provide the system installation guides after the system arriveProduct presentation Interpretation of the process Analyze the investment budgetProfessional and high-quality construction team, standardized construction process, to create high-quality power stationsAccording to the survey results, the best system design scheme and grid connection scheme are customized to escort the high-quality power stationResponsible for preparing the application materials and handling the grid-connected accessProvides an intelligent monitoring system Complete quality assurance system Provide lifetime maintenanceResponsible for cooperating with the power supply company to complete the on-grid test, and realize self-generation and self-use and net access of surplus powerAccording to your installation location, we can provide a certain difference in the service, you can contact customer for consultation.
Package & Shipping
Batteries have high requirements for transportation.
For questions about sea transportation, air transportation and road transportation, please consult us.
Multifit Office-Our Company
HQ located in Beijing, China and founded in 2009 Our factory located in 3/F,JieSi Bldg.,6 Keji West Road,Hi-Tech Zone,Shantou,Guangdong,China.
Multifit was founded in 2009...
Guess what you want to know
Company Qualification
Genuine product guarantee/No false mark/
No exaggeration
One-stop solar shopping experience
Manufacturer's engineers provide one-to-one online guidance
5 year system warranty under normal operation
Factory system
Ground system
Residential system
Bracket : 6m C type steel * 9pcs, 41*41*2.5mm PV Cables (MC4 to Inverter): Black & Red 100M each MC4 CONNECTOR : 10set
Installation area:34m² Solar module:350W*14pcs Inverter:5000W*1unit
This is the best day of the past month. I have a 3 kW Chinese solar system, which is a new system. But the maximum power I got so far is 2.5KW...not bad. But this is not the ideal state, why?Let's take a look at this picture,The shadow on the panels you see is the tree with the rising sun behind the camera. The shadow of the tree occupies 50% of the solar panel area. It is this shadow that caused the power generation efficiency of my new system to not reach the power I wanted. MULTIFIT: It is recommended to stay away from shadows, shading objects, etc., so that the power generation rate will be high.